Blog
16 November 2026
Field notes: the quarter we beat the RFP by eleven monthsA field-notes look at the quarter when watching the paving crew gave us an eleven-month head start on the RFP.
16 November 2026
What a throughput guarantee clause is, and why it dictates crane capacityHow minimum throughput commitments in a concession agreement become a capex trigger for cranes and straddle carriers, long before the tender appears.
9 November 2026
What is a landlord port master plan, and why should it be on your forecast?A landlord port master plan tells you where quay extensions and yard paving are headed years out. Here's how to read one for crane demand.
9 November 2026
RFQ vs RFP in port equipment procurement: what's the differenceRFQ and RFP aren't interchangeable paperwork. Here's what separates a request for quotation from a request for proposal, and when each lands.
2 November 2026
Field notes: the tender we only heard about after the crane was already on the waterA port equipment sales director on the tender nobody saw coming, and why quay works are the real early warning, long before the RFP.
2 November 2026
How many years of service life does a ship-to-shore crane have before replacement?STS crane design life runs 25-40 years, but terminals replace fleets closer to 20-25, driven by berth works more than fleet age.
26 October 2026
How long does it take to deliver a ship-to-shore crane after the order is placed?Why STS crane lead times run 12 to 24 months from order to delivery, what drives the schedule, and why the tender is already too late to start planning.
26 October 2026
New yard paving vs. routine resurfacing: reading the signal in satellite imageryHow to tell terminal yard expansion paving from routine quay apron resurfacing in satellite imagery, and why the difference matters a year before tender.
13 October 2026
Quay wall extension or fender job? Reading berth works from orbitA field guide to telling a quay wall extension from routine fender maintenance in satellite imagery, before the tender confirms it for you.
13 October 2026
Straddle carrier vs reach stacker: telling them apart in satellite imageryHow to identify straddle carriers vs reach stackers in high-res satellite passes, and why the yard equipment mix is worth reading before a tender.
8 October 2026
Capital dredging vs maintenance dredging: telling them apart in satellite imageryHow to read dredge plant, plume pattern and location in satellite passes to tell capital dredging from maintenance work ahead of a tender.
8 October 2026
How long between berth construction and the first crane order?Quay wall lead time, crane procurement lag and why the gap between civil works and the first crane RFP runs a year or more.
8 October 2026
How to read a port authority capital plan for equipment tender timingA line-by-line guide to reading port capex plans for crane and straddle carrier tender timing, and why the plan alone won't give you lead time.
8 October 2026
Quay crane rail gauge: what it tells you about vessel sizeWhat quay crane rail gauge tells sales teams about vessel size, equipment lanes, and the crane order it's likely to trigger.