Blog

  1. 16 November 2026

    Field notes: the quarter we beat the RFP by eleven months

    A field-notes look at the quarter when watching the paving crew gave us an eleven-month head start on the RFP.

  2. 16 November 2026

    What a throughput guarantee clause is, and why it dictates crane capacity

    How minimum throughput commitments in a concession agreement become a capex trigger for cranes and straddle carriers, long before the tender appears.

  3. 9 November 2026

    What is a landlord port master plan, and why should it be on your forecast?

    A landlord port master plan tells you where quay extensions and yard paving are headed years out. Here's how to read one for crane demand.

  4. 9 November 2026

    RFQ vs RFP in port equipment procurement: what's the difference

    RFQ and RFP aren't interchangeable paperwork. Here's what separates a request for quotation from a request for proposal, and when each lands.

  5. 2 November 2026

    Field notes: the tender we only heard about after the crane was already on the water

    A port equipment sales director on the tender nobody saw coming, and why quay works are the real early warning, long before the RFP.

  6. 2 November 2026

    How many years of service life does a ship-to-shore crane have before replacement?

    STS crane design life runs 25-40 years, but terminals replace fleets closer to 20-25, driven by berth works more than fleet age.

  7. 26 October 2026

    How long does it take to deliver a ship-to-shore crane after the order is placed?

    Why STS crane lead times run 12 to 24 months from order to delivery, what drives the schedule, and why the tender is already too late to start planning.

  8. 26 October 2026

    New yard paving vs. routine resurfacing: reading the signal in satellite imagery

    How to tell terminal yard expansion paving from routine quay apron resurfacing in satellite imagery, and why the difference matters a year before tender.

  9. 13 October 2026

    Quay wall extension or fender job? Reading berth works from orbit

    A field guide to telling a quay wall extension from routine fender maintenance in satellite imagery, before the tender confirms it for you.

  10. 13 October 2026

    Straddle carrier vs reach stacker: telling them apart in satellite imagery

    How to identify straddle carriers vs reach stackers in high-res satellite passes, and why the yard equipment mix is worth reading before a tender.

  11. 8 October 2026

    Capital dredging vs maintenance dredging: telling them apart in satellite imagery

    How to read dredge plant, plume pattern and location in satellite passes to tell capital dredging from maintenance work ahead of a tender.

  12. 8 October 2026

    How long between berth construction and the first crane order?

    Quay wall lead time, crane procurement lag and why the gap between civil works and the first crane RFP runs a year or more.

  13. 8 October 2026

    How to read a port authority capital plan for equipment tender timing

    A line-by-line guide to reading port capex plans for crane and straddle carrier tender timing, and why the plan alone won't give you lead time.

  14. 8 October 2026

    Quay crane rail gauge: what it tells you about vessel size

    What quay crane rail gauge tells sales teams about vessel size, equipment lanes, and the crane order it's likely to trigger.

← Back to Terminal Expansion Watch